Typical Project Costs
Every job is different, but these typical cost ranges can help you get a general idea before requesting a quote. Final pricing depends on materials, access, site conditions, distance, preparation work, and project size.
The prices listed below are general estimates only. Final costs depend on availability, hauling distance, prep work, drainage, grading needs, equipment access, and the total size of the job.
Common Materials Available
We supply and deliver many different gravels and aggregate materials. Our most popular include:
✔ Pit Run
✔ 3/4" Minus Basalt
✔ Road Mix
✔ Drain Rock
✔ Sand
✔ Crushed Rock
✔ Rip Rap
✔ Topsoil
✔ River Rock
Pricing: Call for Quote
Not sure what you need? Give us a call! We're happy to help!
Equipment Hauling
Equipment hauling rates are based on a semi truck with flatbed trailer starting from Donnelly, Idaho. Typical loads range from 20,000–50,000 lbs. Rates vary by destination, access, road conditions, wait time, and whether the haul requires special handling.
Destination
Donnelly
McCall
Cascade
Tamarack Resort
Brundage Mountain
New Meadows
Council
Secesh
Warren
Riggins
Garden Valley
Boise Area
One-Way Rate
$175
$225
$225
$200
$275
$325
$425
$375
$500
$550
$525
$675
Roundtrip Rate
$275
$375
$375
$325
$450
$525
$695
$595
$850
$900
$850
$1,100
Notes
Local jobs within 5 miles
Common haul, light mountain driving
Short haul, similar to McCall
Mountain access included
High elevation climb
Light grades, moderate distance
Longer rural route
Remote area; road-dependent
Mountain route; limited access road
Mountain highway
Mountain terrain
Long-haul route; includes return deadhead
How roundtrip pricing works: Roundtrip rates include one loaded leg and one empty return leg. The empty “deadhead” leg is priced at approximately 75% of the loaded rate.
